Intense transmission of visceral leishmaniasis in a region of northeastern Brazil: a situation analysis after the discontinuance of a zoonosis control program.

Nogueira, Ranielly Araujo; Lira, Maria Gabriela Sampaio; Santos, Sarah Ingrid Pinto; Mondêgo-Oliveira, Renata; Andrade, Fábio Henrique Evangelista de; Sousa, Eduardo Martins de; Barbosa, David Soeiro; Abreu-Silva, Ana Lucia; Carvalho, Rafael Cardoso; (2021) Intense transmission of visceral leishmaniasis in a region of northeastern Brazil: a situation analysis after the discontinuance of a zoonosis control program. Revista brasileira de parasitologia veterinaria = Brazilian journal of veterinary parasitology : Orgao Oficial do Colegio Brasileiro de Parasitologia Veterinaria, 30 (1). e020320-. ISSN 0103-846X DOI: https://doi.org/10.1590/S1984-29612021015

Permanent Identifier

Use this Digital Object Identifier when citing or linking to this resource.

https://doi.org/10.1590/S1984-29612021015

Abstract

Item Type Article
Faculty and Department ?? EIDE ??
PubMed ID 33909834
Elements ID 160031

Share

Download

Filename: https _www.scielo.br_j_rbpv_a_b6wBS8XxBZbWSCP7sGQFFkC_ format=pdf&lang=en.pdf

Licence: Creative Commons: Attribution 3.0

Download
[img]

Downloads

View details

Metrics & Citations


Google Scholar